Guide · Tennessee

TVA Section 26a permits for docks and shorelines.

How TVA's Section 26a permits work for docks, boathouses and shoreline work on TVA lakes, how to check whether your lot qualifies, and where a survey helps.

What 26a covers

Most shoreline construction on the Tennessee River system.

Section 26a of the TVA Act requires a TVA permit before shoreline construction on TVA reservoirs and other streams in the Tennessee River watershed. That includes docks, piers, boathouses, ramps, bank stabilization and vegetation removal along the shore.

Land rights

Not every waterfront lot can have a dock.

TVA owns or holds rights to much of the land along its reservoirs and zones it for different uses. Only some of that shoreline carries the land rights that let an adjoining owner apply for a dock. TVA's interactive map shows whether a property may be eligible.

Along many lakes, a strip of TVA land lies between private lots and the water. The boundary is sometimes the reservoir's maximum shoreline contour, an elevation set above the dam's gates. A permit conveys no property interest, and the applicant is responsible for locating the facility on qualifying land.

Applying

What TVA asks for and how long it takes.

  • Property locationAddress or parcel of the land the dock will serve.
  • Plan and drawingThe project plan and a drawing of the proposed dock or work.
  • Land rightsEvidence that the property has the rights needed to apply.
  • TimeTVA says processing can take up to 120 days, so apply well before you plan to build.
Buying a lake lot

Check before you close.

An existing dock does not automatically transfer. A new owner needs to apply to TVA to have the permit in their name, and changes to an existing dock need approval. Before buying, check the TVA map for land rights and ask the seller for the current permit.

Where surveys fit

Knowing exactly where your land ends.

Boundary survey

Shows where your lot ends and TVA land or flowage easements begin, so the dock and path are placed on qualifying land.

Shoreline and elevations

Ties the lot to the reservoir elevations TVA uses, which helps when the boundary follows a contour.

Drawings for the application

An accurate site base for the plan you submit.

Questions

Common questions.

Can I build a dock on any TVA lakefront lot?

No. Only shoreline with the right land rights is eligible. Check TVA's interactive map for your property.

How long does a 26a permit take?

TVA says processing can extend to 120 days.

Does the dock permit transfer when I buy the house?

Not automatically. The new owner applies to TVA to have the permit issued in their name.

Do I need a survey for a 26a application?

TVA asks for a project plan and drawing and evidence of land rights. A boundary survey is the most reliable way to show where your land meets TVA's.

Quotes

Ready to order?

Send the address or parcel ID and what the survey is for. We reply with the right survey, scope, price and timeline.