Guide · Texas

Building over the Edwards Aquifer recharge zone.

What the recharge and contributing zones mean for building around San Antonio and Austin, when the state requires a plan before construction, and where surveys fit in.

The zones

Three zones, set by the state.

The Edwards Aquifer supplies water to San Antonio and much of Central Texas. Because water enters it through the ground, the Texas Commission on Environmental Quality (TCEQ) regulates construction in three mapped zones under its Edwards Aquifer rules (30 TAC Chapter 213).

  • Recharge zoneWhere surface water can readily enter the aquifer. The strictest rules apply here.
  • Contributing zoneThe watersheds that drain onto the recharge zone.
  • Transition zoneAreas next to the recharge zone with features that can still carry water to the aquifer.
When a plan is required

Most construction in the recharge zone needs TCEQ approval first.

A Water Pollution Abatement Plan (WPAP) is required for regulated activities in the recharge zone, which includes most construction-related activity. It sets out how runoff and erosion will be controlled during and after construction, and TCEQ approves it before work starts.

In the contributing zone, a contributing zone plan applies to regulated activities instead. Larger projects also need a geologic assessment signed and sealed by a geologist.

Single-family homes

When a homeowner does not need an individual plan.

TCEQ's guidance for private residences says an individual plan may not be required if the home is part of a master community with an approved plan, or if it is built on a lot larger than five acres with no more than one single-family residence on that lot.

Demolishing an existing home and building a new one can still require an application. If you are unsure whether your lot qualifies, ask TCEQ's regional office or your engineer before you design.

Where surveys fit

Plans start from an accurate picture of the site.

Boundary survey

Confirms the lot lines and acreage, which matters when the five-acre threshold is close.

Topographic survey

Shows grades, drainage paths and site features that engineers use to design runoff controls.

Features near the site

Caves, sinkholes and other recharge features are assessed by a geologist; the survey gives them an accurate base map.

What to send

What makes the quote precise.

  • Address or appraisal district account numberSo we can check which zone applies.
  • Lot size and what you plan to buildHome, addition, subdivision or commercial site.
  • Any existing survey or platIt speeds up the boundary work.
  • Your engineer's requirementsIf an engineer is preparing the plan, their survey specifications.
Questions

Common questions.

How do I know if my property is over the recharge zone?

TCEQ publishes maps of the recharge, contributing and transition zones. Send us the address and we will confirm which zone applies before the proposal.

Do I need a plan to build one house over the recharge zone?

Not always. An individual plan may not be required on a lot larger than five acres with one home, or in a master community with an approved plan. Check with TCEQ for your lot.

Who prepares the Water Pollution Abatement Plan?

Usually a civil engineer. The surveyor supplies the boundary and topographic survey the plan is built on.

Does the Edwards Aquifer rule affect fences?

TCEQ's rules treat fences and similar low-impact activities differently from construction. Check with TCEQ for your specific project.